The AL-41ST-25 was developed by the Lyulka Design Bureau (a branch of UEC-UMPO) for the gas transmission industry in the 25 and 32 MW classes. UEC-UMPO has built two 25 MW prototypes, and the engine is in pilot operation as part of a gas compressor unit at the Arskaya compressor station in Tatarstan.
Following tests of the second prototype, designers refined the flow path aerodynamics and the air and oil systems, reaching 39.3% efficiency at ISO conditions. The family is being developed on a common gas generator, from 25 to 32 MW and later to 45 MW. The 40-45 MW class fills the gap between 25-32 MW units and large machines such as the GTE-170 and GTD-110M. UEC Engineering will act as the turnkey equipment supplier.
While new Russian machines are still in testing, imported gas turbines of this class and smaller remain in service at oil and gas fields and power plants. SeverEnergoProject provides their service, overhaul and supply of Solar spare parts.
Source: Gas Turbine Technologies (gtt.ru)